CONTRACTOR:
LK FRIESLAND
LOCATION:
FRIESLAND
BEGINNING CONSTRUCTION:
2016
BUILDING END:
2017
BUSINESS AREA:
ENVIRONMENTAL AND GEOTECHNICAL ENGINEERING
LOWER:
OSNABRÜCK
Three drilling mud pits are located in the area of responsibility of the lower soil protection authority of the district of Friesland. With the purpose of making closer investigations of such drilling mud pits affordable for the districts in Lower Saxony and to hold the industry to its obligation, a settlement agreement was concluded between the State of Lower Saxony and the WEG. On this basis, the agreement for the promotion of investigations of suspected contaminated sites at locations of former oil and drilling mud pits was adopted. After phase I (historical investigation) carried out by M&P, phase II (OU with site investigations) is now also being carried out by M&P.
Scope of services Phase II according to Geofacts 29:
- Drawing up a work plan taking into account occupational health and safety measures
- Explosive ordnance clearance measurement of the drill points
- 22 Small pile driving holes
- Establishment of 9 groundwater monitoring wells and groundwater sampling
- Topsoil sampling and testing
- Laboratory analytics
- Evaluation and assessment of the results of Phase II, hazard assessment for the individual impact pathways, assessment of further need for action