Explosive ordnance

CONVERSION FORMER BW HOSPITAL ROSTRUP, BAD ZWISCHENAHN

Project details

The former BW hospital on the Zwischenahner Meer was acquired by the "Palais am Meer" investor group in 2013. Due to its previous use in World War II as part of the Rostrup airbase, the site is classified as contaminated with explosive ordnance. History has shown that the area was badly hit by several heavy bombing raids, some with long-life fuses. Due to the use at that time, soil contamination by operating materials (aviation fuel, etc.) has been detected in local areas.

After its use as an air base, a military hospital was built by the British armed forces, which was subsequently used by the Bundeswehr until the end of 2000. After several small-scale commercial uses, the site was completely abandoned in 2009.

The area covers about 18 hectares. In the future, several residential and recreational quarters (hotel, holiday village) are to be built here. For this purpose, it is necessary to remove all relics from the WWII era, the existing building fabric, the traffic routes and infrastructures on the entire site. Furthermore, it must be ensured that there are no risks for future use with regard to harmful soil changes and explosive ordnance.

Due to its former use as an airbase, the site is covered with waste-relevant fill materials that must be removed and separated before explosive ordnance can be explored. By classifying the materials, the aim is to ensure that as little as possible has to leave the site (disposal) and that the greater part can be reused for site profiling.
It must be taken into account that part of the site is located in a landscape conservation area.
to be integrated, which places further demands on the soil quality.

Scope of services:

  • Deconstruction planning incl. pollutant register
  • Explosive ordnance detection and clearance planning
  • Investigation/hazard assessment in the sense of BBodSchG
  • Planning soil remediation
  • Soil and waste management planning
  • Preparing investigations in the LSG
  • Conducting discussions with authorities
  • Support of the AG in renegotiations with the BImA
  • Preparation of tender documents and participation in bidder interviews
  • Monitoring of the execution, coordination of the individual trades, cost controlling,
    Sampling and analytics
  • Implementation of funding management (N-Bank -> EFRE)

The above services cover the AHO/HOAI planning areas in all phases.

CONTRACTOR:
PALAIS AM MEER GMBH & CO. KG

LOCATION:
GERMANY

TIMEFRAME:
2016 - 2019

BUSINESS AREA:
FIGHTING MEDIUM

LOWER:
HANNOVER

SIMILAR PROJECTS

EXPLOSIVE ORDNANCE, SOIL MANAGEMENT AND EXPERT MONITORING OF THE "SÜDBAHNHOF RETAIL PARK, HANOVER" DEVELOPMENT PROJECT
PROJECT DEVELOPMENT/CONVERSION FORMER BARON VON FRITSCH BARRACKS
ORDNANCE DISPOSAL IMMENSTAAD-FRIEDRICHSHAFEN B31