New construction of logistics centre Bochum, Karl-Lange-Straße 49 in 44791 Bochum
Project details
CONTRACTOR:
PRIVATE
BEGINNING CONSTRUCTION:
2016
BUILDING (PLAN):
-
BUSINESS AREA:
ENVIRONMENTAL AND GEOTECHNICAL ENGINEERING
LOWER:
HAGEN
After purchasing the land, Dietz Logistik 25. Grundbesitz GmbH intended to build a new logistics centre. The planning provided for an elevation of the site by approx. 1.50 m below the ground slab, which entailed extensive earth relocations. A total of approx. 65,000 m³ of soil materials had to be relocated or delivered from outside.
Field of activity
- Land development
- Environment
- Geotechnics
Order
Phase I:
- Subsoil investigation incl. foundation consulting (September 2016)
- Soil management concept (May 2017)
Phase II:
- Expert monitoring of the earthworks (May 2017 to date)
- Delivery control of externally delivered materials
- Waste-related construction supervision, classification of excavated material relevant for disposal
- Carrying out geotechnical tests (plate load tests)
- Geotechnical laboratory investigations
- Documentation