Replacement of the Königstraße overpass

Project details

CONTRACTOR:
DB Netz AG

LOCATION:
Hanover, Germany

BEGINNING CONSTRUCTION:
2017

BUILDING (PLAN):
2019

BUSINESS AREA:
ENVIRONMENTAL AND GEOTECHNICAL ENGINEERING

LOWER:
HANNOVER

The railway bridge over Königstraße was put into operation in 1880. After almost 140 years, the structure has reached the end of its technical service life. The structure contains coal tar sealants with PAH contents of up to 60,000 mg/kg. Furthermore, the overlying superstructure material (gravel, soil) also shows considerable chemical impairments. Due to the tight scheduling (closure periods) and the spatial conditions on the construction site, extensive coordination was carried out in advance with the authorities and waste disposal companies involved. Furthermore, an occupational health and safety concept was drawn up and agreed with the trade supervisory authority. In the course of the implementation of the work, the expert supervision of the demolition work was carried out as well as the waste-technical declaration of all excavation and demolition masses, including the mass and cost register as well as the processing in the eANV.

Scope of services:

  • Advisory service
  • Specialist construction supervision
  • Sampling and analytics
  • electronic waste records
  • Voting by authorities

SIMILAR PROJECTS

Orienting investigation of old deposits in Tündern
Verification of the utilisation history of former drilling mud pits in Schleswig-Holstein
Orienting investigation B-Plan 320 Norderstedt