{"id":20387,"date":"2023-06-28T10:44:41","date_gmt":"2023-06-28T10:44:41","guid":{"rendered":"https:\/\/mullund-partner-de-wordpress.rz.mup-digital.com\/?post_type=projects&#038;p=20387"},"modified":"2023-08-28T07:07:25","modified_gmt":"2023-08-28T07:07:25","slug":"neubau-logistikzentrum-bochum-karl-lange-strase-49-in-44791-bochum","status":"publish","type":"projects","link":"https:\/\/mullundpartner.de\/en\/projects\/neubau-logistikzentrum-bochum-karl-lange-strase-49-in-44791-bochum\/","title":{"rendered":"New construction of logistics centre Bochum, Karl-Lange-Stra\u00dfe 49 in 44791 Bochum"},"content":{"rendered":"<p><strong>CONTRACTOR:<\/strong><br>PRIVATE<\/p>\n\n\n\n<p><strong>BEGINNING CONSTRUCTION:<\/strong><br>2016<\/p>\n\n\n\n<p><strong>BUILDING (PLAN):<\/strong><br>-<\/p>\n\n\n\n<p><strong>BUSINESS AREA:<\/strong><br>ENVIRONMENTAL AND GEOTECHNICAL ENGINEERING<\/p>\n\n\n\n<p><strong>LOWER:<\/strong><br>HAGEN<\/p>\n\n\n\n<p>After purchasing the land, Dietz Logistik 25. Grundbesitz GmbH intended to build a new logistics centre. The planning provided for an elevation of the site by approx. 1.50 m below the ground slab, which entailed extensive earth relocations. A total of approx. 65,000 m\u00b3 of soil materials had to be relocated or delivered from outside.<\/p>\n\n\n\n<p><strong>Field of activity<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Land development<\/li>\n\n\n\n<li>Environment<\/li>\n\n\n\n<li>Geotechnics<\/li>\n<\/ul>\n\n\n\n<p><strong>Order<\/strong><\/p>\n\n\n\n<p>Phase I:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Subsoil investigation incl. foundation consulting (September 2016)<\/li>\n\n\n\n<li>Soil management concept (May 2017)<\/li>\n<\/ul>\n\n\n\n<p>Phase II:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Expert monitoring of the earthworks (May 2017 to date)<\/li>\n\n\n\n<li>Delivery control of externally delivered materials<\/li>\n\n\n\n<li>Waste-related construction supervision, classification of excavated material relevant for disposal<\/li>\n\n\n\n<li>Carrying out geotechnical tests (plate load tests)<\/li>\n\n\n\n<li>Geotechnical laboratory investigations<\/li>\n\n\n\n<li>Documentation<\/li>\n<\/ul>","protected":false},"author":3,"featured_media":0,"parent":0,"template":"","company-group":[64],"project-category":[54],"class_list":["post-20387","projects","type-projects","status-publish","hentry","company-group-mp-ingenieurgesellschaft-projekte","project-category-umwelt-und-geotechnik"],"_links":{"self":[{"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/projects\/20387","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/users\/3"}],"wp:attachment":[{"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/media?parent=20387"}],"wp:term":[{"taxonomy":"company-group","embeddable":true,"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/company-group?post=20387"},{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/project-category?post=20387"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}