{"id":17727,"date":"2022-10-14T06:53:13","date_gmt":"2022-10-14T06:53:13","guid":{"rendered":"https:\/\/mullund-partner-de-wordpress.rz.mup-digital.com\/?post_type=product&#038;p=17727"},"modified":"2023-02-20T13:23:04","modified_gmt":"2023-02-20T13:23:04","slug":"new-logistics-center-bochum-karl-lange-strasse-49-in-44791-bochum","status":"publish","type":"product","link":"https:\/\/mullundpartner.de\/en\/product\/new-logistics-center-bochum-karl-lange-strasse-49-in-44791-bochum\/","title":{"rendered":"New construction of logistics centre Bochum, Karl-Lange-Stra\u00dfe 49 in 44791 Bochum"},"content":{"rendered":"<p><strong>CONTRACTOR:<\/strong><br \/>\nPRIVATE<\/p>\n<p><strong>BEGINNING CONSTRUCTION:<\/strong><br \/>\n2016<\/p>\n<p><strong>BUILDING (PLAN):<\/strong><br \/>\n-<\/p>\n<p><strong>BUSINESS AREA:<\/strong><br \/>\nENVIRONMENTAL AND GEOTECHNICAL ENGINEERING<\/p>\n<p><strong>LOWER:<\/strong><br \/>\nHAGEN<\/p>\n<p>After purchasing the land, Dietz Logistik 25. Grundbesitz GmbH intended to build a new logistics centre. The planning provided for an elevation of the site by approx. 1.50 m below the ground slab, which entailed extensive earth relocations. A total of approx. 65,000 m\u00b3 of soil materials had to be relocated or delivered from outside.<\/p>\n<p><b>Field of activity<\/b><\/p>\n<ul>\n<li>Land development<\/li>\n<li>Environment<\/li>\n<li>Geotechnics<\/li>\n<\/ul>\n<p><b>Order<\/b><\/p>\n<p>Phase I:<\/p>\n<ul>\n<li>Subsoil investigation incl. foundation consulting (September 2016)<\/li>\n<li>Soil management concept (May 2017)<\/li>\n<\/ul>\n<p>Phase II:<\/p>\n<ul>\n<li>Expert monitoring of the earthworks (May 2017 to date)<\/li>\n<li>Delivery control of externally delivered materials<\/li>\n<li>Waste-related construction supervision, classification of excavated material relevant for disposal<\/li>\n<li>Carrying out geotechnical tests (plate load tests)<\/li>\n<li>Geotechnical laboratory investigations<\/li>\n<li>Documentation<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>CONTRACTOR: PRIVATE START OF CONSTRUCTION: 2016 END OF CONSTRUCTION (PLAN): - BUSINESS SECTOR: ENVIRONMENTAL AND GEOTECHNICAL ENGINEERING LOCATION: HAGEN After purchasing the property, the<\/p>","protected":false},"featured_media":17728,"template":"","meta":{"inline_featured_image":false},"product_brand":[],"product_cat":[53],"product_tag":[],"class_list":{"0":"post-17727","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-umwelt-und-geotechnik","8":"first","9":"instock","10":"shipping-taxable","11":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/product\/17727","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/types\/product"}],"version-history":[{"count":3,"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/product\/17727\/revisions"}],"predecessor-version":[{"id":18925,"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/product\/17727\/revisions\/18925"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/media\/17728"}],"wp:attachment":[{"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/media?parent=17727"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/product_brand?post=17727"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/product_cat?post=17727"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/mullundpartner.de\/en\/wp-json\/wp\/v2\/product_tag?post=17727"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}